Background Image
Table of Contents Table of Contents
Previous Page  80 / 268 Next Page
Basic version Information
Show Menu
Previous Page 80 / 268 Next Page
Page Background

www.konyaexports.com

Konya Exports October 2014

72

energy can meet electric need of about

300 homes. Including our company, many

others have applied for producing un-licen-

sed electric energy of about 600 MW. With

licensed productions a market of 1.5 billion

Euro for solar electric power is emerged

soon. Our company has established energy

systems for several industries such as mining,

packaging, warehousing, water distribution

etc., in several provinces in Turkey, including

Burdur, Istanbul, Balikesir, Antalya, Nevsehir

and Aksaray.

At about the end of 2014, what projects did

your company complete and what is your

road map for the future?

2013 was promising though late moves in

interest and currency rates have chan-

ged our investment plans. We hope that

the market will again be stabilized soon.

Solarex solar energy and technologies

fair, held in April 2014 was very produc-

tive for us. We have plans for facilities of

about 10 million Euros. We are working on

projects in Morocco and Quwait in coo-

peration with one of the global constru-

ction companies. We established Turkey’s

first photovoltaic solar energy plant in 2013.

We made several works for Toki and Emlak

Konut companies in their buildings, in

packaging, stone processing, warehousing

companies.

The New Antalya Stadium, will be the first in

the world by having been equipped with

the biggest solar energy system that will

be followd by the one in Taiwan, 1 MWp,

and in Switzerland, 1.3 MWp. Construction

works are ongoing to mount about 6 thou-

sand solar panel on the roof of the stadi-

um. It will provide the energy needed in

the stadium and surplus is to be sold to the

national energy web. The project will also

serve in the promotion of the concept and

mission of clean energy and better future

for next generation. Besides we have other

projects in Eskisehir, Nevsehir, Diyarbakir,

Amasya, Tokat and Samsun.